Safe maintenance and service work techniques

Techniques
Tools
Personal protective equipment (PPE)
Asbestos vacuum cleaners
Decontamination
Clearance inspections
Waste removal and disposal

Wherever possible, dry ACM should not be worked on.

Techniques

Techniques to prevent or minimise the generation of airborne asbestos fibres include:

Ensure that the work has been assessed for any electrical hazards that may result from the use of water or other liquids. If an electrical hazard exists, primary consideration should be given to removing the ACM, rather than relying on dry work methods.

More information on safe maintenance and service work techniques can be found in section 11.5 of the asbestos management code (non-Queensland Government link).

Tools

More information on tools can be found in section 11.6 of the asbestos management code (non-Queensland Government link).

Personal protective equipment (PPE)

The risk assessment should determine the need for and the appropriate types and levels of PPE. This includes respiratory equipment.

All respiratory protection equipment should meet the requirements of AS/NZS 1716 Respiratory Protective Devices (non-Queensland Government link) .

More information on PPE is available from:

Asbestos vacuum cleaners

More information on vacuum cleaners is available in section 11.8 of the asbestos management code (non-Queensland Government link) .

Decontamination

The type of decontamination required depends on the type of asbestos (friable or non-friable), the work method used and the site conditions.

There are two procedures for workplace decontamination:

If extensive contamination has occurred, an asbestos removalist should be engaged to perform the decontamination. Clearance monitoring may be required.

All tools, equipment and reusable respirators used during the work should be dismantled (where appropriate) and decontaminated. This should be done using either wet or dry decontamination methods.

Personal decontamination must be undertaken every time a worker leaves the asbestos work area and again when the asbestos task is completed.

More information on decontamination procedures can be found in section asbestos management code (non-Queensland Government link) .

Clearance inspections

A risk assessment should determine whether a clearance inspection is required on completion of the asbestos task.

These inspections can include:

More information on these types of inspections is available in section 11.10 of the asbestos management code (non-Queensland Government link) .

Waste removal and disposal

Asbestos waste should always be removed and disposed of by a competent person. This includes contaminated PPE and cleaning materials used in the work.

Asbestos waste can be collected and disposed of in:

Controlled wetting of asbestos waste should be used to reduce the possibility of dust emissions during the bagging or containment of the waste.

More information on waste disposal methods can be found in section 11.11 of the asbestos management code (non-Queensland Government link) .

Last updated 21 August 2008